Commercial case study · Rugby

Four-cassette air conditioning for a Rugby club gym.

A commercial system designed to distribute heating and cooling across a large open training space, supported by destratification fans to keep the air moving effectively.

Four ceiling cassette air conditioning units and destratification fans in a Rugby club gym
4 ceiling cassettesCoverage across the gym
Destratification fansImproved air circulation
Commercial gymDesigned for an open space
Mitsubishi Heavy IndustriesOutdoor equipment
The project

Comfort and air movement throughout the training space.

The Rugby club needed an air conditioning solution suited to a large, open gym. Four ceiling cassette units were positioned at high level to distribute conditioned air across the training areas without taking up valuable wall or floor space.

Destratification fans support the system by circulating air through the full height of the building and helping return rising warm air to the occupied zone. Outside, the condensing units were installed on firm bases with tidy services and accessible local isolators.

Ceiling cassette air conditioning and destratification fans suspended above the Rugby club gym
Even air distribution across the training area
Mitsubishi Heavy Industries outdoor air conditioning unit installed beside the gym
Outdoor equipment installed on a firm base
Outdoor air conditioning units and electrical isolators installed along the gym exterior
Neat external services and accessible isolators

Planning air conditioning for a gym or commercial space?

Climetech Ltd will survey the building and recommend a system around its layout, occupancy and heat load.

Request a free survey
WhatsApp us